Crack fixed
(This is the before)
(After)
So to fix our crack ( floor to ceiling ) they chiseled out the crack, opened up the floor to the drain tile. Sealed the crack, put a special plastic barrier along the wall and leading into the drain tile, sealed that, and then filled in the floor to the drain tile. Done by a reputable company, that comes with a lifetime warranty. The company specializes in my states foundation repairs. Besides the crack being gnarly, all looked well, when he got into the drain tile -- it was still intact.
Now we have 2 weeks to wait for the cement to cure. (Dry) Then the electrical and drywall will go back up.
We will only be putting up drywall over 2 outside walls. No more small little rooms in the basement.
So during the 2ww ( week wait ). We are cleaning!! They put up plastic to contain the dust, but that space has a nice layer. Then the poured concrete wall needs to be washed, so it can be painted(sealed) . Get the dinginess off it.
If any time left. Prepping the ceiling, and potentially paint it.
We also have to go purchase all the materials for the wall construction.


No comments:
Post a Comment