Crack fixed
(This is the before)
(After)
So to fix our crack ( floor to ceiling ) they chiseled out the crack, opened up the floor to the drain tile. Sealed the crack, put a special plastic barrier along the wall and leading into the drain tile, sealed that, and then filled in the floor to the drain tile. Done by a reputable company, that comes with a lifetime warranty. The company specializes in my states foundation repairs. Besides the crack being gnarly, all looked well, when he got into the drain tile -- it was still intact.
Now we have 2 weeks to wait for the cement to cure. (Dry) Then the electrical and drywall will go back up.
We will only be putting up drywall over 2 outside walls. No more small little rooms in the basement.
So during the 2ww ( week wait ). We are cleaning!! They put up plastic to contain the dust, but that space has a nice layer. Then the poured concrete wall needs to be washed, so it can be painted(sealed) . Get the dinginess off it.
If any time left. Prepping the ceiling, and potentially paint it.
We also have to go purchase all the materials for the wall construction.






















